EdilKamin SEVEN Instalación Uso Y Mantenimiento página 19

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
COVERING ASSEMBLY
Covering parts list:
• pre-mounted steel sides (11)
• pre-mounted pellet hopper cast iron cover (16)
• ceramic upper top (14) to be mounted
• ceramic front insert (75) to be mounted
After having positioned the stove taking into account
requirements reported in the INSTALLATION
INSTRUCTIONS, proceed in the following order:
• position the ceramic top (14) by simply resting it in
its place.
• open the door and fasten the ceramic front insert
with silicone (75) in the provided housing on the
lower cast iron door (76).
SIDES (11) DISASSEMBLY INSTRUCTIONS
14
The stove is supplied with pre-mounted steel sides (11)
B
16
which can be disassembled according to the following
16
A
instructions:
14
• Remove the ceramic top (14) .
• Fully open the pellet hopper cover (16).
11
• Remove the back panel (49) by loosening the screws.
75
• Carefully remove the steel sides (11) by moving aside
76
the rear side and slipping it off upward.
D
• Proceed in reverse for reassembly.
D
11
49
16
E
11
11
D
11
C
19
Tabla de contenido
loading

Tabla de contenido