Securing The Front Shelf Brackets; Installing The Front Shelf; Installing The Grill Cooking Components - Navigator PIT BOSS PB550G Manual De Instrucciones

Ocultar thumbs Ver también para PIT BOSS PB550G:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20

12. SECURING THE FRONT SHELF BRACKETS

Parts Required:
1
x
Front Shelf Bracket Right (#21)
1
x
Front Shelf Bracket Left (#22)
Screw (#A)
4
x
Washer (#B)
4
x
4
x
Locking Washer (#C)
Installation:
Secure each Front Shelf Support Bracket onto the Front Support Leg by
using two screws, washers and locking washers.

13. INSTALLING THE FRONT SHELF

Parts Required:
1
x
Front Shelf (#20)
Installation:
Place the Front Shelf on the Front Shelf Support Brackets. Note
illustration 13A as unfolded Front Shelf.
Note illustration 13B as folded Front Shelf.
Front Shelf can also be placed on the Bottom Support Plates and be used
as Bottom Plate. Note illustration 13C.

14. INSTALLING THE GRILL COOKING COMPONENTS

Parts Required:
2
x
Cooking Grids (#25)
1
x
Warming Rack (#26)
Installation:
Place the Cooking Grids, side by side, on the grid ledge inside the Main Grill.
Place the Upper Warming Rack on the upper ledge inside the Main Grill.
The Warming Rack will lock into place.
12
22
ACB
13A
20
13B
20
13C
14
26
25
21
ACB
20
25
9
Tabla de contenido
loading

Este manual también es adecuado para:

10613

Tabla de contenido