Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation

1
Preparing for installation
CAUTION: Always turn off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Place the faucet assembly (A) through the
mounting holes in the sink.
Install the rubber washer (B), and metal washer
(C) onto the threaded mounting shank.
Thread the nut (D) onto the mounting shank
using the basin wrench. Do not overtighten.
A
B
C
D
15
2
Making the water supply
connections
NOTE: The hot side inlet tube is indicated by a label.
If the label is not present, the hot supply tube is the longer
of the two inlet tubes.
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
1
3
NOTE: Before tightening the faucet connector to the water
supply, apply a second wrench to the supply tube tting.
This will prevent the supply tube from moving or twisting
when tightening the faucet connector. Do not overtighten.
2

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido