Torin BIG RED JACKS T84007 El Manual Del Propietario página 7

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic
system as a result of product shipment and handling. This step is to be completed without any weight on the
jack.
1. Remove cover plate.
Cover plate
2. Turn release valve counter-clockwise on full turn
to the open position.
3. Rapidly pump the handle 6-8 times. Leave handle
in down position to expose oil fill plug.
4. With a flat blade screwdriver, push the oil fill plug
slightly to the side to purge trapped air from
system. (Use caution not to tear or puncture the
oil plug.)
5. Replace Cover Plate.
Cover plate
6. Turn release valve clockwise to the closed
position.
7. Jack is now ready for use. Check for proper pump
action. (Repeat steps if neccessary).
7
Tabla de contenido
loading

Tabla de contenido