Riello 20131666 Instrucciones Para El Usuario, El Instalador Y Para El Servicio Técnico De Asistencia página 17

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 46
INSTALLATION
− Fit the gasket (1).
− Fit the electric heater element, complete with flange (2),
in the storage cylinder.
− Align the hole (H) in the flange (2) and the hole (I) in the
gasket (1) with the hole (L) in the flange of the storage
cylinder.
− Fasten the flange of the electric heater element with the
nuts (D) removed previously (tightening torque 14 to 15
Nm).
L
13
9
Fill the boiler and check the hydraulic sealing of the seals
(flange and heating element).
INSTALLATION ON TYPE 2 STORAGE CYLINDER
− Remove the cover (A) of the flange with the insulation (B)
− An M8 screw (C) is fitted onto the insulation (B) for remov-
ing the flange.
9
Keep the M8 screw (C) for use for future inspections.
− Undo the screws (D).
− Remove the flange (E) from the storage cylinder, tighten-
ing the M8 screw (C) into the threaded hole (F).
− Check the sealing wear condition (G) and if necessary re-
place it with the one supplied with the accessory.
1
I
H
C
B
2
D
9
Keep the screws (D), as they will be used later to fasten the
element.
− Fit the gasket (1).
− Fit the electric heater element, complete with flange (2),
in the storage cylinder.
− Align the hole (H) in the flange (2) and the hole (I) in the
gasket (1) with the hole (L) in the flange of the storage
cylinder.
− Fasten the flange of the electric heater element with the
screws (D) removed previously (tightening torque 14 to 15
Nm).
A
9
Fill the boiler and check the hydraulic sealing of the seals
(flange and heating element).
17
G
13
E
1
I
13
H
INSTALLATION
F
C
D
2
D
Tabla de contenido
loading

Este manual también es adecuado para:

201316672013166920131670

Tabla de contenido