Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
1

Install Unit

Rough-in of plumbing lines and wall braces must be
completed before unit can be properly installed.
A
Remove Access panel and with
the help of another person, place
unit in position against wall .
B
Ensure unit is level, shimming floor unit if
necessary . Mark the wall anchor locations .
2
Connect Water Supply to Valve Assembly
WARNING! Do not turn on water until
Step 4 is completed!
Connect stops to hot and cold water supply .
A
Connect one end of each supply hose to a
stop and the other end to the hot and cold
inlets of the Navigator
Bradley • 215-1758 Rev. A; ECN 14-00-007
Water Supply
Gang Valve
Assembly
Navigator TMV
TMV .
®
OPTIONAL TEMPERED LINE CONNECTION: Connect
B
stop to supply . Connect one end of the supply hose to the
stop and the other end to the tempered line adapter in the
gang valve assembly .
Install suitable wall anchors (supplied
C
by installer) for 3/8" bolts at the marked
locations . Secure unit to wall .
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Braided
Hose
Cold Supply Inlet
Hot Supply Inlet
10/28/2014
SN2003/TT, SN2023/TT
Water Supply
Gang Valve
Assembly
OPTIONAL
Tempered
Line Adapter
Assembly
(S39-804)
Stop Valve
5
Tabla de contenido
loading

Este manual también es adecuado para:

Sn2023/tt

Tabla de contenido