Installation
In order to install the tunnel, consult 'Installation recommendations
for bow thrusters' , Vetus art. code 020571.03
For overall dimensions see drawing, page 65.
4 .1
Preparation
The bow thruster will be delivered fully as­
sembled. Perform the following steps:
• Remove the propeller.
• Remove the motor from the intermediate
flange.
• Remove the intermediate flange from the
tail piece.
The 2 bushes are only required for trans­
port and are now no longer needed.
4 .2
Installation tailpiece and intermediate flange
• Ensure that the plastic shim plate (1) has been positioned on the
tail piece.
• Place one packing (2) between the tail piece and the tunnel.
• Apply a sealant (e.g. polyurethane or silicone) between the tail
piece and packing, and between the packing and the tunnel wall.
• Place the tail piece in the hole in the tunnel.
Any extra packings used should be ones capable of justifying the
tail piece.
*) e.g. Sikaflex®­292.
• Grease the hole of the intermediate flange and position this
flange. Fit the bolts.
• Now check size 'A' ('A' = 'B' + 8 mm ). Use the adjustable screw 'C' , if
needed, to achieve the correct size 'A' .
12
020523.09
The areas in which the electric motor of the bow thruster and
the battery are positioned must be dry and well ventilated.
2
1
vetus® Operation manual and installation instructions bow thruster BOW3512D
n
ote
A = B + 8 mm
A = B +
5
/
"
16
M5
3
3 Nm
(2.2 ft.lbf )