Montaje; Columna De Elevación; Montaje De La Percha; Batería Y Mando - Etac Molift Serie Manual De Usuario

Ocultar thumbs Ver también para Molift Serie:
Tabla de contenido
Molift Mover 205 / www.etac.com
Cargue la batería. No coloque la batería en el
soporte durante el montaje.
Columna de elevación
Place lifting column in chassis. Make sure that
the red arrow on the lower part of the column
corresponds with the edge of chassis.
Make sure screw on column is inside the hole
on chassis. This will prevent the column from
unintentionally being lifted out of chassis when
lock handle is pushed down.
Fix the column by pushing the lock handle on the
back all the way down.
Mounting suspension
Turn connection point on lifting arm in top
position.
Insert bolt on suspension in connection point to
mount suspension. When bolt is completely inside
the suspension is mounted and can rotate freely.

Montaje

Batería y mando
1
1.
Connect hand control to bottom of battery
holder.
2. Insert battery.
3. Connect hand control wire to push handle so
it does not fall to the floor when dropped.
Lista de comprobación después del montaje
No empiece a utilizar la grúa sin
haber realizado la lista de compro-
bación tras su montaje.
Utilice esta lista de comprobación para verificar
que la grúa esté instalada y funcione de forma
correcta y segura antes de su uso.
Asegúrese de que el brazo elevador, la
columna elevadora y la percha están fijados
correctamente y de que la grúa no tiene piezas
sueltas.
Asegúrese de que la batería está cargada (las
luces de la batería no están encendidas).
Compruebe que la grúa no presenta ningún
daño visible ni otros fallos.
Realice una elevación con carga (60-80 kg)
5
2
3
Tabla de contenido
loading

Este manual también es adecuado para:

Molift mover 205Bm05108 rev. k

Tabla de contenido