ASSEMBLY / PRE-OPERATION
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the
spring as shown.
1. Slide rubber sleeve up rod and hook end of spring into
control arm with loop opening up as shown.
2. With top end of rod positioned under right side of
control panel, push down on rod and insert end of rod
into hole in auger control bracket. Secure with retainer
spring.
AUGER
CONTROL
ROD
RUBBER
SLEEVE
CONTROL
ARM
AUGER CONTROL ROD
RETAINER
SPRING
LOOP
OPENING
UP
FIG. 5
AUGER
CONTROL
LEVER
AUGER
CONTROL
BRACKET
FIG. 6
INSTALL DISCHARGE CHUTE / CHUTE ROTATOR
HEAD (See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotator head.
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2. Position chute rotator head over chute bracket. If nec es -
sary, rotate chute assembly to align square and pin on un-
der side of chute rotator head with holes in chute brack et.
3. With chute rotator head and chute bracket aligned,
po si tion chute rotator head on pin and threaded stud
of mounting bracket.
4. Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHUTE
ROTATOR
HEAD
CHUTE
ALIGN BEFORE
BRACKET
TIGHTENING LOCKNUT
CHECK TIRE PRESSURE
The tires on your snow thrower were overinflated at the fac-
tory for shipping purposes. Correct and equal tire pres sure
is important for best snow throwing performance.
•
Reduce tire pressure to 14-17 PSI (19-24.5 N-m).
6
3/8 LOCKNUT
3/8 WASHER
THREADED
STUD
ROTATOR HEAD
MOUNT ING
BRACKET
FIG. 7
PIN