General Warnings - Ferroli ATLAS 32 Instrucciones De Uso, Instalación Y Mantenimiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
EN

1. GENERAL WARNINGS

Carefully read and follow the instructions contained in this instruction booklet.
After boiler installation, inform the user regarding its operation and give him this
manual, which is an integral and essential part of the product and must be kept with
care for future reference.
Installation and maintenance must be carried out by professionally qualified person-
nel, in compliance with the current regulations and according to the manufacturer's
instructions. Do not carry out any operation on the sealed control parts.
Incorrect installation or inadequate maintenance can result in damage or injury. The
Manufacturer declines any liability for damage due to errors in installation and use,
or failure to follow the instructions.
Before carrying out any cleaning or maintenance operation, disconnect the unit from
the electrical power supply using the switch and/or the special cut-off devices.
In case of a fault and/or poor operation, deactivate the unit and do not try to repair
it or directly intervene. Contact professionally qualified personnel. Any repair/re-
placement of the products must only be carried out by qualified personnel using orig-
inal replacement parts. Failure to comply with the above could affect the safety of
the unit.
This unit must only be used for its intended purpose. Any other use is deemed im-
proper and therefore hazardous.
The packing materials are potentially hazardous and must not be left within the
reach of children.
The unit must not be used by people (including children) with limited physical, sen-
sory or mental abilities or without experience and knowledge of it, unless instructed
or supervised in its use by someone responsible for their safety.
The unit and its accessories must be appropriately disposed of, in compliance with
the current regulations.
The images given in this manual are a simplified representation of the product. In
this representation there may be slight and insignificant differences with respect to
the product supplied.
2. OPERATING INSTRUCTIONS
2.1 Introduction
Dear Customer,
Thank you for choosing a FERROLI boiler featuring advanced design, cutting-edge
technology, high reliability and quality construction. Please read this manual carefully
since it provides important information on safe installation, use and maintenance.
ATLAS is a high-efficiency heat generator for the production of heating hot water, suita-
ble for operation with blown oil or gas burners. The boiler shell consists of cast iron ele-
ments, assembled with steel stays and double cones, whose profile is specially designed
with optimum division of the fins, offering high thermal efficiency and therefore high en-
ergy-saving.
2.2 Control panel
1
°C
60
40
80
20
100
0
120
°C
fig. 1 - Control panel for models ATLAS 32-78
1
30
°C
60
40
80
20
100
0
120
0
°C
fig. 2 - Control panel for models ATLAS 95
Key
1 =
Thermometer
2 =
Ignition switch
3 =
Manual reset safety thermostat
4 =
1st stage temperature control knob
5 =
2nd stage temperature control knob
16
EN
2
3
4
30
60
0
90
4
5
3
60 30
60
90
0
90
cod. 3541S126 - Rev. 02 - 09/2018
2.3 Turning on and off
Boiler lighting
Open the fuel shutoff valves.
Switch on the power to the unit.
Press button 2 of fig. 1 to feed the boiler and burner. Refer to the burner manual for op-
eration.
Turning the boiler off
For brief shutdown periods just press button 2 of fig. 1 on the control panel , bringing it
to position "0". For long shutdown periods, as well as operating button 2 also close the
fuel shutoff valve . To avoid damage caused by freezing during long shutdowns in winter,
add a suitable antifreeze to the system or completely drain the system.
2.4 Adjustments
Heating temperature setting
Set the required system temperature with the control thermostat 4 of fig. 1.
For the model ATLAS 95, with the control thermostat 5 then set the temperature of the
2nd stage to a temperature 10°C lower than that of the 1st stage.
IMPORTANT: The temperature setting of the 2nd stage must always be
A
lower than that of the 1st stage..
4
fig. 3 - Temperature adjustment for model ATLAS 95
Room temperature adjustment (with optional room thermostat)
Using the room thermostat, set the temperature desired in the rooms. If the room ther-
mostat is not installed the boiler will keep the heating system at its setpoint temperature.
3. INSTALLATION
3.1 General Instructions
BOILER INSTALLATION MUST ONLY BE PERFORMED BY QUALIFIED PERSON-
NEL, IN ACCORDANCE WITH ALL THE INSTRUCTIONS GIVEN IN THIS TECHNICAL
MANUAL, THE PROVISIONS OF CURRENT LAW, THE PRESCRIPTIONS OF NA-
TIONAL AND LOCAL STANDARDS AND THE RULES OF PROPER WORKMANSHIP.
3.2 Place of installation
The boiler must be installed in a special room with ventilation openings towards the out-
side in conformity with current regulations. If there are several burners or extraction units
that can work together in the same room, the ventilation openings must be sized for si-
multaneous operation of all the units. The place of installation must be free of flammable
objects or materials, corrosive gases, volatile substances or dusts which, sucked by the
burner fan, can obstruct the pipes inside the burner or the combustion head. The room
must be dry and not exposed to rain, snow or frost.
If the unit is enclosed in a cabinet or mounted alongside, a space must be pro-
A
vided for removing the casing and for normal maintenance operations. In par-
ticular, after boiler installation with burner on the front door, make sure the front
door can open freely without the burner striking walls or other obstacles.
3.3 Plumbing connections
The heating capacity of the unit must be previously established by calculating the build-
ing's heat requirement according to the current regulations. The system must be provid-
2
ed with all the components for correct and regular operation. It is advisable to install
shutoff valves between the boiler and heating system allowing the boiler to be isolated
from the system if necessary.
B
The safety valve outlet must be connected to a funnel or collection pipe to pre-
vent water spurting onto the floor in case of overpressure in the heating circuit.
Otherwise, if the discharge valve cuts in and floods the room, the boiler manu-
facturer cannot be held liable.
on
Do not use the water system pipes to earth electrical appliances.
Before installation, carefully wash all the pipes of the system to remove any residuals or
off
impurities that could affect proper operation of the unit.
Carry out the relevant connections according to the diagram in and thecap. 5 symbols
given on the unit.
The unit is not supplied with an expansion tank; its connection must therefore
A
be carried out by the Installer. The pressure in the system, when cold, must be
1 bar.
ATLAS
60
60
5
Tabla de contenido
loading

Este manual también es adecuado para:

Atlas 47Atlas 62Atlas 78Atlas 95

Tabla de contenido