7. Solvent Weld the Tubing
Solvent weld the PVC tubing connections, using care to maintain the established drainage pitch in
the lines. make sure each union connection includes the required O-ring. Securely hand tighten the
union nuts.
Solvent weld the heater pressure switch into the open tee fitting at this time.
CHECK POINT # 5.
Confirm that:
¤
All previous check point requirements have been met.
¤
The solvent welding is complete and the union nuts, with O-rings in place, have
been hand tightened.
¤
The pressure switch from the heater is solvent welded.
Kohler Co.
17
1030218-2-B