Diamond ARP2/L22 Manual De Instalación, Uso Y Mantenimiento página 39

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
Remove the protective PVC film from the internal
and external walls, avoiding the use of metal
tools.
8.2.
Installation
All the installation phases must be considered,
from the moment of creation of the general plan.
The installation area must be equipped with all
power supply and production residue drainage
connections and must be suitably lit and respect
current laws regarding hygiene and sanitary
requirements.
GB
To optimise consumption and reduce wear of the
machine, do not position it in the vicinity of heat
sources or in environments where temperatures
are too high.
Proceed with machine levelling, adjusting the
individual feet.
!
ATTENTION: the appliance requires the minimum functioning spaces as shown in the diagram.
!
This appliance can only be installed and
operate
in
rooms
ventilated, in order to guarantee correct operation.
Connect and leave for a certain period of
time
(at
least
2
functioning. During transport it is probable that the
compressor
lubricant
refrigerant circuit blocking the capillary: as a
consequence the appliance will function for a
certain period of time without producing cold until
the oil has returned to the
SET
SET
16
which
are
permanently
hours)
before
checking
oil
has
entered
the
compressor.
Tabla de contenido
loading

Este manual también es adecuado para:

Ahri0011

Tabla de contenido