Wall Support And Anchoring - Layher 1401101 Instrucciones De Montaje Y Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

}
For work performed on a load-bearing wall, ballasting can be reduced
11. WALL SUPPORT (under load)
in accordance with the Ballasting table (see pages 8 to 10). In this
ANCHORING (under load and tension)
case, wall supports or anchoring must be installed on both
sides of the tower. Use the Uni distance tube
21
and ix it to the
ladder frame
12/13
using two couplers
22
in each case. The rubber
mount is positioned on the wall to provide support (see detail A).
The Uni distance tube, rotated by 180°, is used for anchoring and
is itted in an eyebolt which was attached to the wall previously
(see detail B). The mobile beams must be installed so that they
project at the side facing away from the wall. The wall supports/
anchoring must be attached at the level of the top working platform or
at most 1 m below that.
Detail A
Detail B
25
Tabla de contenido
loading

Productos relacionados para Layher 1401101

Tabla de contenido