Layher 1401101 Instrucciones De Montaje Y Uso página 47

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Adjustment of the mobile beam
1
K
5
Maximum spindle adjustment
of the various models
Assembly with 1323.180
Models: 1401102, 1401104, 1401106
Assembly with 1323.320
Models: 1401108, 1401110
V
M
S
Models: 1401103, 1401105
The adjustable mobile beam
and at the wall without dismantling the scaffolding. It can be retracted
and extended in the assembled state. Ensure before adjustment the
ballast weights specified in the ballasting table are always attached
at the right place (see pages 8 –10). For adjustment in the assembled
state, lower the central support
far as possible and secure it. Relieve the castors
by turning the spindle
when the clamping wedge
the clamping wedge K, subject the castor
the spindle, and move the central support
Models: 1401109, 1401111
5
permits operation in the centre position
M
attached to the mobile beam
1
at the sliding parts
S
until the adjustment part
V
K
has been loosened. After adjustment, fix
1
to load again by turning
M
upwards and secure it.
Assembly directly on castors with
access ledger
Models: 1401101
(access ledger add. required)
1401124 – 1401131
1401145 – 1401151
Assembly directly on castors
Model: 1401101
5
as
can be adjusted
15
Tabla de contenido
loading

Productos relacionados para Layher 1401101

Tabla de contenido