Mitsubishi Heavy Industries eco touch RC-EX1A Manual De Instalación página 18

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 144
⑩ Enter the Phone No. of the contact
⑪ Test run
12
13
14
⑫ Cooling test run
⑬ Drain pump test run
⑭ Compressor Hz fixed operation
All manuals and user guides at all-guides.com
⑩ Enter the Phone No. of the contact.
Tap the Set button after the input.
⑪ Test run
Select a test run item to be implemented.
(a) Cooling test run: Operation can be made only in cooling mode. ➝ ⑫
(b) Drain pump test run ➝ ⑬
(c) Compressor Hz fixed operation: Setting can be made when the unit is
stopped. This operation starts by operation procedure of the unit. ➝ ⑭
⑫ Cooling test run
When the room temperature is too low to start the cooling test run, it operates
for 30 minutes by decreasing the set temperature to 5°C.
⑬ Drain pump test run
Drain pump can be operated independently.
⑭ Compressor Hz fixed operation
Compressor operation frequency of the inverter outdoor unit can be fixed. It
may not be able to control effectively depending on the outdoor unit models.
— 17 —
loading

Este manual también es adecuado para:

Eco touch rc-ex1n