Putting Out Of Operation; Maintenance And Cleaning - Abicor Binzel CAT2 Instructivo De Servicio

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CAT2
7 Operation
NOTICE
• The system may only put into operation by authorized personnel
Due to the fact that the CAT2 is integrated into the welding process of the torch,
the operating steps are performed after the respective torch has been put into
operation.

8 Putting out of operation

NOTICE
• Please make sure that the shutdown procedures for all components
Putting out of operation depends on the respective welding torch.

9 Maintenance and cleaning

Scheduled maintenance and cleaning is a prerequisite for a long life and a
trouble-free operation. In doing so, observe the following:
Risk of injury due to unexpected start-up.
The following instructions must be adhered to for the entire duration of
maintenance, servicing, mounting, dismounting and repair work:
• Switch off the power supply.
• Close off the compressed air supply.
• Disconnect all electrical connections.
Electric shock
Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and
• Replace any damaged, deformed or worn parts.
All manuals and user guides at all-guides.com
(in Germany see TRBS 1203).
mounted in the welding system are strictly observed before putting out of
operation begins.
DANGER
DANGER
damage.
7 Operation
EN - 19
Tabla de contenido
loading

Tabla de contenido