Installation Requirements - Eco-Flo WG20 Manual Del Propietário

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6. Connect discharge hose (not included) to the pump discharge port. It is best to use a short, large-diameter hose,
because this will reduce fluid friction and improve pump performance. A long or small-diameter hose will increase
fluid friction and reduce pump output.
7. Tighten the clamp securely to prevent the discharge hose from disconnecting under high pressure.
JOINT

INSTALLATION REQUIREMENTS

• Use reinforced hose to make the suction connection.
• Hose must be strong enough to not collapse during operation.
• Suction screen area must be at least four times suction pipe area.
• All suction hose must slope up toward suction port.
• Support the hose and fittings to reduce strain on the pump case.
• Depth of suction port must be at least (4) times the diameter of the suction hose to avoid forming vortexes....
EXAMPLE: 2" Pipe x 4 = 8" minimum depth.
NOTE: Do not start or run the pump dry or damage to the mechanical seal will result.
NOTE: Add engine oil before startup.
1. A self-priming pump only needs to be manually primed at the first start. Once primed, under normal conditions
the pump will reprime automatically at each subsequent start-up. If the pump is used in portable applications and
the water has been drained from the pump case, re-prime before start-up.
2. To prime, remove the water filter plug 6 (see page 6) from the top discharge port and fill the pump with water.
Replace the plug and start the pump. The pump will require a few minutes to evacuate air from the suction line.
After several minutes of operation, the pump will be fully primed and pumping water. Priming time will vary
depending on the length and diameter of the suction line.
3. Refer to the BEFORE YOU START THE ENGINE and ENGINE OPERATIONS sections of this manual for starting
and operating instructions.
For parts or assistance, call ECO-FLO Customer Service at 1-877 326-3561
DISCHARGE
WASHER
PORT
CLAMP
DISCHARGE
HOSE
INSTALLATION
PIPE JOINT
DISCHARGE
HOSE
OPERATION
5
HOSE CONNECTOR
CLAMP
Tabla de contenido
loading

Tabla de contenido