7.
Drill 1/8" holes through the side nailing-in flange.
Secure the nailing-in flange to the stud wall with
screws or galvanized nails.
8.
Drill 1/8" holes through the bottom nailing-in flange.
Secure the nailing-in flange to the floor with screws
or galvanized nails. Shim beneath the bottom
nailing-in flange, if necessary.
9.
Install the apron panel by centering it on the apron
frame. Press the apron panel onto the frame so each
of the hook and loop strips engages securely.
10. Install wall covering and flooring. Maximum wall
thickness is 1-1/2" (3.8cm). The maximum floor
thickness is 2" (5cm).
Kohler Co., Kohler, WI U.S.A.
Bottom Nailing-In Flange
(Shim As Needed)
Apron Frame
Hook And
Loop Strips
Apron Panel
3
Stud
Side Nailing-In
Flange
Square
Apron Frame
1007225-2-
B