Testing The Safety Assembly Module; Technical Data; Dimensions And Connections - Blanco Hot Boiler 4L EU Instrucciones De Uso Y De Montaje

Calentador de agua caliente para sistemas y grifería de agua caliente de blanco
Ocultar thumbs Ver también para Hot Boiler 4L EU:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 88
EN
CLEANING, CARE, MAINTENANCE
12.2

Testing the safety assembly module

The safety valve must be checked every six months to ensure it functions
correctly. To do so, briefly turn the cap on the pressure control valve in the
safety assembly through about 90°. This opens the valve and water will flow
into the drain. Ensure that the drain is correctly installed and the water can
drain away correctly. No more water must come out after you release the cap.
If this is not the case, the pressure control valve no longer shuts correctly and
the safety assembly needs to be replaced.
13.

Technical data

13.1

Dimensions and connections

Mains cable
EU: Types E+F CEE 7/7 Schuko safety plug
UK: Type G / BS 1363 British 3 pins (13 A fuse)
Cold water inlet connection
G 1/2" internal thread
Hot water outlet connection
G 3/8" external thread
350 mm
24
ø 229 mm
800 mm
337 mm
UK
art. no.: 525 788
EU
art. no.: 525 233
1600 mm
Tabla de contenido
loading

Este manual también es adecuado para:

Hot boiler 4l uk525233

Tabla de contenido