"GLFI10N" INSTALLATION

- Open the packaging of the accessory, flow
frame and intake grid unit, remove the grid
from the packaging and check that it has not
been damaged during transport.
- Open the cover of the terminal board on the
electric box. Use a tool to release the pres-
surised hooks.
- Set the dip switches according to the selected
operating parameters.
- Connect the power supply cables to the termi-
nal board as indicated in the wiring diagram.
- Fix all cables using the cable gland.
- Close the cover of the electric terminal board.
- Insert the electric box into the FCLI unit guide
and make sure that the connectors are well
attached.
- The electric box must be fixed to the FCLI unit
using two screws. The screw on the attachment
side is also used to fix the supplied safety cable.
ATTENTION: fix the safety cable to the electric
12
AGLFI10NJ 2006-5905221_03
box screw fastener positioned at the side of
the hydraulic connections. The safety cable
snap hook must then be attached to the grid
frame.
- Remove the intake grid by acting on the 2 ratch-
ets by ¼ of a turn.
- To make fixing of the frame to the fan coil eas-
ier, insert two support hooks to the relevant
pegs on the conveyor.
- Hang the frame on the two support hooks, pay
attention to the assembly position, the corner
of the frame with the AERMEC logo holder
must coincide with the corner of the FCLI unit
electric box.
- ATTENTION: fix the safety cable to the frame.
- Connect the receiver connection cable to the
connector on the circuit board box.
- Fix the frame to the unit using the 4 screws
supplied.
CAUTION!! tighten the screws with maximum
coupling torque of 0.45 Nm. It is advised to
use a screwdriver, do not use non calibrated
electric screwdrivers. An excessive coupling
torque will damage the tray irreparably.
The frame guarantees sealing between air
intake and flow, therefore, it must be fixed cor-
rectly to the unit without undergoing deforma-
tions.
- Fix the intake grill to the safety cable.
- Mount the intake grid, hooking it to the hinge
on the frame.
- Close the intake grid and tighten the two ratch-
ets (on the side opposite the hinge) by ¼ of a
turn.
- Adjust the position of the unit by the support
bracket by means of the nuts, in a way that the
unit is level and the frame rests slightly in the
suspended ceiling.
- Start the fan coil and carry out a functioning
test.