IT
ES
4.4
BOILER CALIBRATION
PT
GAS CONVERSION
GB
– Close the gas cock.
– Replace the injector (pos. 30)
RUS
and the relevant gasket (pos.
45).
– Cut the specified resistance on
the fan control board.
– Test for soundness all the gas
Adjustment and control operations must be performed with the heater in operation while heating is underway
AIR CALIBRATION
Electrically disconnect the hea-
ting probe (SM) and connect
the wires to another similar
free probe. Turn the heating
potentiometer knob to the
maximum setting, remove the
knob and connect the differen-
tial manometer (+ sign) to the
air pressure intake [7 - Drawing
1].
Sequence of operations:
1) Turn the heating power trim-
mer anticlockwise to the
bottom of the scale B [6 -
Drawing 2].
2) Calibrate the air signal using
the minimum fan power
adjustment trimmer A [4 -
Drawing 2] to obtain the
figure in mmH
the table:
25 BF
G20
G31
3) Turn on a hot water tap to
bring the boiler up to maxi-
mum hot water power.
4) Calibrate the air signal using
the maximum fan power
adjustment trimmer D [2 -
Drawing 2] to obtain the
figure in mmH
the table:
25 BF
G20
G31
After completion of calibration operations, check CO
values appearing in the tables, correct as necessary:
"MIN" power
"MAX" power
– Use the OFFSET screw ( 8 – Drawing 5 ) to correct CO
– Use the capacity step to correct CO
84
connections using soapy water
or appropriate products.
DO NOT USE NAKED FLAMES.
– Stick onto the casing panel the
plate showing the relevant fee-
ding gas.
– Proceed with air and gas cali-
bration as described below.
O shown in
2
30 BF
13,0
13,0
13,0
13,0
6
O shown in
2
30 BF
93,0
93,0
93,0
93,0
"Format Dewy.zip 25 BF"
CO
(Methane)
2
9,0 ±0,3
9,0 ±0,3
at "MAX" output ( 7 – Drawing 5 ).
2
GAS CALIBRATION
Connect the differential mano-
meter (+ sign) with decimal
scale in mm or Pascal to the
gas intake [6 - Drawing 3].
Sequence of operations:
1) Turn the heating power adju-
stment trimmer anticlockwi-
se to the bottom of the
scale B [6 - Drawing 4].
Drawing 1
2) Fully open the gas capacity
step [7 - Drawing 5]
3) Calibrate
using the OFF-SET adjust-
ment screw [8 - Drawing 5]
to obtain the figure in
mmH
2
G20
2
G31
4) Close the gas capacity step
[7 - Drawing 5] to obtain the
figure in mmH
the table:
4
G20
G31
Drawing 2
values using a combustion analyser. If discrepancies are found with respect to the
2
CO
(Propane)
2
9,9 ±0,2
9,9 ±0,2
at "MIN" output.
2
34
28
14
16
106
28
29
30
64
45
57
6
gas
pressure
O shown in the table:
25 BF
30 BF
6
12,0
12,0
13,0
13,0
7
O shown in
2
25 BF
30 BF
10,5
10,5
12,5
12,5
"Format Dewy.zip 30 BF"
CO
(Methane)
2
9,0 ±0,3
9,0 ±0,3
32
35
Drawing 3
2
4
Drawing 4
8
Drawing 5
CO
(Propane)
2
9,9 ±0,2
9,9 ±0,2