Mounting The Product - SMA PPM-RC-10 Instrucciones De Funcionamiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

5 Mounting
5.2

Mounting the product

Risk of injury due to weight of product
Injuries may result if the product is lifted incorrectly or dropped while being transported or mounted.
• Transport and lift the product carefully. Take the weight of the product into account.
• Always have two persons mount and disassemble the product.
• Wear suitable personal protective equipment for all work on the product.
Additionally required mounting material (not included in the scope of delivery):
☐ 4 screws, washers and fastening material suitable for the support surface
Requirements for anchoring points:
☐ Weight force at each of the 4 anchoring points (screw and fastening material): at least 25 kg (55 lb)
Procedure:
1. Attach the wall mounting bracket to the enclosure using fastening
material, torque: 13 Nm (115 in-lb)).
2. Mark the position of the 4 drill holes and drill the holes. Use the recesses for the upper wall mounting brackets
and the holes for the lower wall mounting brackets.
3. If necessary, provide the 4 drill holes with suitable screw anchors.
4. Turn suitable screws with washers into the upper 2 drill holes. Turn the screws far enough to be able to hang the
product on them.
5. Hang the product onto both upper screws.
6. Turn 2 suitable screws with washers through the holes in the lower
wall mounting brackets.
7. Tighten all 4 screws.
8. Ensure that the product is securely in place.
16
PPM-RC-10-BE-xx-10
CAUTION
SMA Solar Technology AG
Operating manual
Tabla de contenido
loading

Tabla de contenido