Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
The best results will be achieved if the
.
coolant container is at the level as the
expansion tank in the vehicle.
Open stopcock V1.
.
(see illustr. 11)
Check the volume of coolant filled or fill the expansion tank
.
up to the max. mark. (see illustr. 12)
If residual vacuum is present in the cooling system after filling,
.
it can be released by opening stopcock V2.
Note:
Start the vehicle to bleed the secondary cooling circuit if applicable. This may also cause
the coolant level in the expansion tank to fall, in which case top off manually.

Delivery specification

KVB 01:
Available spare parts:
ET 340 (121356)
ET 380 (121396_1) stopcock with hose connector
ET 408 (121395_2) stopcock with nipple for connection venturi nozzle
ET 315 (121333)
ET 409 (121444_1) filling or extraction hose PVC, length 1,50 m
ET 341 (121346)
We reserve the right to introduce technical alterations without notice
8
KVB 01 basic unit with vacuum meter -1 to 0 bar with rubber cap,
venturi tube and connecting tubes, boxed.
vacuum meter DS 63, -1 to 0 bar
venturi nozzle
quick coupling G 1/4
V1
V2
(Illustr. 11)
(Illustr. 12)
05/09
Tabla de contenido
loading

Tabla de contenido