EdilKamin BIJOUX Instalación Uso Y Mantenimiento página 45

Ocultar thumbs Ver también para BIJOUX:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 86
COVERING INSTALLATION STRASS/CAMEO
PHASE E
E
52
58
L
PHASE F
74
74
78
PHASE G
PHASE E
• Using the screws (71) and washers (151) supplied, mount the cast iron front panel
(53) onto the upper front panel (69) and reposition it "G".
F
• Remove the lower front panel "H" (52)
71
• Using the screws (71) and washers (151) supplied, mount the cast iron front panel
69
(53) onto the lower front panel (52) and reposition it in housing "I".
53
• Replace the two upper right (51) and left (49) front panels and screw the front
G
with the previously removed screws.
53
• Position the front grille (69) by pressing
58
H
L
71
I
PHASE F
• Position the cast iron top (78), the three pads (74) in their housing, then place the
stone top (79) over.
79
PHASE G
• The boiler-stove is now ready to be positioned.
- 45
-
Tabla de contenido
loading

Este manual también es adecuado para:

CameoStrassTresor

Tabla de contenido