EdilKamin ALPEN Instalación Uso Y Mantenimiento página 40

Ocultar thumbs Ver también para ALPEN:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 69
Before performing any maintenance, disconnect the appliance from the mains
Regular maintenance is re uired for the boiler-stove to function correctly
The boiler-stove ill trigger the message: smo e C high' or Mainten ' to appear on the panel hen further cleaning is
necessary This is preceded by Clean e chang ' appearing on the display
FAILURE TO PERFORM REGULAR MAINTENANCE, at least on a SEASONAL basis, could lead to poor functionality
Any problems resulting from lac of maintenance ill immediately void the arranty
NOTE: The DEALER, upon commissioning, sets the g value of consumed pellets; after hich, the message "SERVICE
UTE" ill appear on the display The boiler-stove continues operation, but the end client is invited to perform careful
maintenance, described above and e plained by the DEALER during commissioning, to the e tent of his abilities To elimi-
nate the message from the display, press the boiler button for at least 5 seconds after having completed maintenance
N B
- Any unauthorised modi cation is forbidden
- Use spare parts recommended by the manufacturer
- The use of non-original parts invalidates the arranty
DAILY MAINTENANCE
Operations must be performed hen the stove is off, cold and unplugged from the po er supply
THE CLEANING RODS * MUST BE AGITATED ONCE A DAY WITH THE GLOVE IN EQUIPMENT ALSO FRE-
QUEN WHILE THE BOILER-STOVE IS IN FUNCTION IN ORDER TO ALLOW FOR FUEL SAVINGS:
DO NOT EMPTY THE RESIDUE OUT INTO THE PELLET HOPPER
NEVER SUCTION HOT ASH, as this could damage the suction device and possibly cause a re
*
WEEKLY MAINTENANCE
MAINTENANCE
1
**
- 40
-
*
Tabla de contenido
loading

Este manual también es adecuado para:

AndeFujiUral

Tabla de contenido