English
1. AC Inlet
2. Backup Outlets: Schuko x 1 , IEC x 1
3. Computer Interface: USB communication port.
4. RJ11/RJ45 Jacks: MODEM /LAN Protection
5. Site Wiring Fault Indicator: For 115Vac system only.
6. AC Fuse Holder. (VA/fuse)
400VA/220Vac or 230Vac/4A
600VA/220Vac or 230Vac/6A
800VA/220Vac or 230Vac/8A
Inspection
Inspect the UPS upon receipt. Notify the carrier and dealer if there is
damage. The package is recyclable; save it for reuse or dispose of it
properly.
Placement
Check the Site Wiring Fault Indicator(115V only)
Caution: If the site wiring fault indicator lights, get a qualified electrician
to correct the building wiring.
4. Installation & usage