HYDAC International SB Instrucciones De Montaje Y Reparación página 16

Acumulador de vejiga
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
17*
18
EN
– Assemble the other components in the following order:
Washer (15), O-ring (16), support ring (23*), spacer (17*),
groove nut (18).
– Tighten groove nut (18) to correct torque
(table "TORQUE").
– Screw in vent screw (19) and tighten to the correct torque
(table "TORQUE").
– Unscrew lock nut (4).
* not present on all accumulator types
16
15
16
23*
– Put on the type code label (8), screw on lock nut (4) and
tighten to correct torque (table "TORQUE").
– Tighten gas valve insert (3) using suitable tool
(table "TOOLS") and tighten to correct torque
(table "TORQUE").
NOTICE
The HYDAC FPU charging and testing unit must be used
to charge the bladder accumulator.
Refer to the "Charging and testing unit FPU" instruction
manual, no. 3.501.BA, for handling, safety and warning
information.
Check the pre-charge pressure (p
– Set the required pre-charge pressure (p
HYDAC charging and testing unit FPU.
– Screw on the seal cap (5) and tighten with the correct
torque (table "TORQUE").
– Check the torque of the lock nut (4) and groove nut (18)
again (table "TORQUE" ).
– Screw open the protective cap (6) finger-tight.
– After the hydraulic line has been connected it must be
completely bled.
5
6
) at room temperature.
0
) by using the
0
Tabla de contenido
loading

Tabla de contenido