Finally, turn the hammerhead nut 90°.
Assembling the conveyor belt
The input conveyor belt is delivered completely protected and
1
boxed. Open the box and check the contents. Place the parts on a
3
Place the two sets of telescopic legs (B) on the conveyor band
4
assembly (A), as shown in the following image. Mark the positions
insert the nuts following the instructions in the Start-Up section of
this manual.
Mount the two tilting feet (G) on each of the two sets of telescopic
2
legs (B), as shown in the following image..
Replace the telescopic legs (B) and secure them using a No. 6
5
hex key and the DIN 7380 M8x16 bolts (H) and the DIN 125 M8
washers (K).
www.masterproducts.es
21