Prepare The Site - Kohler K-1167 Guia De Instalacion

Bañera de hidromasaje
Ocultar thumbs Ver también para K-1167:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1/16"
(2 mm)
Tile
Approved Tile Backing

1. Prepare the Site

Concrete Construction
NOTICE: Adequate floor support must be provided. Consult the roughing-in sheet packed with your
whirlpool for specific floor loading requirements.
Make sure the flooring offers adequate support for your whirlpool, and verify that the subfloor is
flat and level.
NOTE: This bath should be installed in an alcove installation.
Construct brick or concrete supports.
Install an access panel to allow the pump to be serviced.
Provide a 1/16" (2 mm) gap between the whirlpool rim and the concrete or brick framing. Frame
the floor, or construct a frame for a raised installation, in accordance with the roughing-in
information packed with the whirlpool.
Position the plumbing according to the roughing-in information packed with this bath. Cap the
supplies, and check for leaks.
Kohler Co.
Bath
Brick
Tile
Approved Tile Backing
Brick
5
Apron Side
1167604-2-A
Tabla de contenido
loading

Tabla de contenido