Install The Blower Tube; Install The Battery Pack; Remove The Battery Pack; Operation - GreenWorks Commercial 82B600 Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

10.2

INSTALL THE BLOWER TUBE

1. Move the tube until the tube release button engages into
the slot.
10.3

INSTALL THE BATTERY PACK

WARNING
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read and understand the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
10.4

REMOVE THE BATTERY PACK

1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
11

OPERATION

WARNING
Make sure the blower tube is in position before operation.
English
11.1

START THE MACHINE

1. Pull the trigger (1) to start the machine.
2. Pull the trigger fully to increase the speed.
3. Release the trigger to decrease the speed.
11.2

STOP THE MACHINE

1. Release the trigger to stop the machine.
11.3

TURBO BUTTON

1. Push the turbo button, the machine is at the highest speed.
2. Release the turbo button, the machine is at the normal
speed.
Using the turbo button drains the battery the fastest. Only
use the turbo button when needed.
11.4

CRUISE CONTROL LEVER

1. Pull the cruise control lever clockwise to increase the
speed. This will lock the speed at the desired setting.
2. Push the cruise control lever counter clockwise to
decrease the speed.
If you decrease the speed all the way, the unit will stop and
it is necessary to start the machine again.
11.5

OPERATION TIPS

Blow around the outer edge of the unwanted materials to
prevent the unwanted materials from scattering.
7
NOTE
NOTE
EN
Tabla de contenido
loading

Tabla de contenido