Barrette STANDARD Serie Instrucciones De Instalación página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

3.
Post Location:
Measure the width of the fence panel (X) plus the
width of the post (Y). This is the common center-
to-center measurement (unless there is a cut-down
panel) for post hole location (Fig. 4).
Post Installation:
Dig first two post holes 6" in diameter and down to
your specified frost line. Insert filler/gravel into the
bottom of both holes and then set first post in post
hole.
Add wet or dry concrete mix according to the
manufacturer's instruction to the top of the hole for
first post only and level it.
Example: When your frost line is 36" insert 12"
of gravel/ filler and 24" of post with concrete
surrounding (Fig. 5).
Gate Installation:
4.
The opening between the posts should be 1
wider than the gate width to allow for hinges.
(Example: Use a 48" opening for a 46
gate.) Be sure posts are level and plumb.
4
Example:
Example:
"
1
2
" wide
1
2
X
X+Y
Frost Line
6"
Fig. 4
Y
Fig. 5
Gravel/
Filler
Tabla de contenido
loading

Este manual también es adecuado para:

Heavy-duty serie

Tabla de contenido