Kohler K-16238 Guia De Instalacion página 12

Ocultar thumbs Ver también para K-16238:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

9. Connect the Supplies
Install the bidet using the bidet manufacturer's instructions.
Connect the supply tubes to the handle valve inlets and then to
the supply stops. Left is hot and right is cold.
Tighten all connections.
10. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Adjust as
needed.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks.
Turn off the faucet.
1054192-2-A
Valve
Inlet
Supply
Tube
Shut-off
Valve
12
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-16238-416238-4-af16238-4-cp16238-4-sn16238-4-bvK-16238-3

Tabla de contenido