Techno Sun ELECSUN2 Manual De Usuario página 4

Regulador de carga
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4. Second, connected to the solar panel: Pay attention to
the "+" and "–" ,in case of reverse connection. If
connected well and have sunshine, the indicator light will
be on. Otherwise, please check the connection.
5. Third, connected to the load: connect the load lead
with the load output end of controller, be care that the
current must be less than the
current rating of the solar
controller.
6. Controller can identify voltage of storage battery the
circuit is powered on. Please connect storage battery at
first and ensure the installation is reliable.
7. Controller will become hot during running. Therefore, it
is suggested to install it in a ventilated environment.
8. Controller will test the ambient temperature and then
charge the storage battery. Therefore, please place the
storage battery and the controller in the same
environment.
9. Choose the cable with enough capacities for
connection to avoid excessive consumption on circuit
which may result in wrong judgment of controller.
10. Controller is designed with share positive poles. If
grounding needs to be connected, please use the
positive pole.
11. It is important to completely charge the storage
battery, at least once a month.
Otherwise, battery will suffer from permanent damage.
Only when power that enters into the battery is more
Tabla de contenido
loading

Tabla de contenido