Kohler K-14434 Guia De Instalacion página 12

Ocultar thumbs Ver también para K-14434:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Aerator
9. Installation Checkout
Connect the tailpiece and P-trap (as needed).
Ensure that all connections are tight.
Open the drain.
Turn on the main water supply and check for leaks. Repair as
needed.
Remove the aerator. Point the spray nozzle down.
Open both hot and cold valves and run water through the spout
for about a minute to remove debris. Check for leaks. Turn valves
off.
Turn off the water.
Remove any debris from aerator and reinstall.
1032027-2-B
12
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-14434-4aK-14434-4

Tabla de contenido