Tower Mounting - Tripp-Lite SmartPro SMX5000XLRT3U El Manual Del Propietario

Ocultar thumbs Ver también para SmartPro SMX5000XLRT3U:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Mounting
4
With the aid of an assistant (if
necessary), lift your equipment and
slide it into the shelves. Attach the
equipment mounting brackets to the
forward mounting rails with user-
supplied screws and washers
Tighten all screws securely.
Threaded-Hole Rack Installation
1
Align the mounting rail
inside surface of the rack posts
that the flanges on the ends of the rail
wrap around to the front and rear
surfaces of the posts and the rail holes
meet the threaded holes on the rack
post.
2
Secure the shelves
rails permanently using user-supplied
screws and washers
shown. Place 6 screws total at the
front and 4 screws total at the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install
your equipment until you have
inserted and tightened the required
screws.
3
Follow steps
3
mount your 3U equipment.

Tower Mounting

If you tower mount this UPS, it requires the addition of a
Tripp Lite 2U to 9U tower stand (model: 2-9USTAND, sold
separately). See owner's manual for installation
procedure.
Rotate the power module's Control Panel to view it easier
while the UPS is tower mounted. Insert a small
screwdriver, or other tool, in the slots on either side of the
Control Panel. Pop the panel out; rotate it; and pop the
panel back into place.
18-08-323-932460.indb 4
.
D
along the
A
so
B
to the mounting
A
for your rack as
C
and
of the Square-Hole Rack Installation instructions (above) to securely
4
D
4
A
B
1
A
C
2
4
A
B
C
2/13/2019 2:53:45 PM
Tabla de contenido
loading

Este manual también es adecuado para:

Smartpro agsm5247

Tabla de contenido