Heath Zenith SL-4300 Manual De Instrucciones página 2

Ocultar thumbs Ver también para SL-4300:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

DISASSEMBLE LIGHT FIXTURE
1. Remove two decorative nuts from light fixture
cover.
2. Remove cover from base.
IT E
®
B R
A L
D U
S K
D U
W N
D A
T O
6
3
F
O F
M IN
1 0
5
1
E
S T
-T IM
O N
T E
3. Remove two decorative nuts from fixture
screws in universal mounting bracket.
4. Remove universal mounting bracket from
base.
Decorative Nut
B R
A L
D U
6
3
F
O F
5
1
-T IM
S T
O N
T E
Light Fixture Base
Light Fixture Cover
Decorative Nut
Universal
Mounting
Bracket
®
IT E
S K
W N
D U
D A
T O
M IN
1 0
E
INSTALL UNIVERSAL MOUNTING
For best performance, mount the fixture at least 8
feet (2.4 m) above the ground.
IMPORTANT: Turn power off at circuit breaker.
1. Tighten the two fixture screws finger tight.
2. Attach universal mounting bracket to junction
box securely with the two screws provided.
WIRING LIGHT FIXTURE
1. Connect the junction box wires and the fixture
wires together as shown in the following dia-
grams.
CAUTION: DO NOT remove wire connector
from RED wire or connect the RED wire unless
you want to control other lights from this motion
sensor fixture.
2. Twist and secure wires with wire nuts.
Note: If you have a metal junction box use the
recommended grounding method shown in the
following illustration. If you are uncertain about the
grounding method, consult your local building code.
2
BRACKET
Junction Box
Universal Mounting
Bracket
Junction Box Screw
Fixture Screw (Tightened
Finger Tight)
598-1208-00
Tabla de contenido
loading

Tabla de contenido