STEP 8
NOTE: Make sure you are installing in a clean, dry and safe environment.
8-1. Place the tape strips (J) around the seams of the tubes.
8-2. Place the top of the unit against the ceiling in the desired location (fig.1) and then compress
the unit UP and move the bottom end into place (fig.2) so that the unit is in a vertical
position. NOTE: Make sure the assembly is in place, secure and vertical.
fig.1
fig. 2
fig. 2
tub ledge installation
shower stall floor installation
If needed, refer to STEP 7 to ensure that the assembly measures 2 inches longer than your
tub or shower stall opening height AND that the Twist tube (B) is tight.
This ensures the proper tension!
(800) 892-3986
IS02147-I3
Pg 13 of 28