2.10 Completion Of Work - ATH-Heinl Comfort Lift 2.35 Manual De Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 263
101: Hydraulic block
103: Emergency descent screw
107: Hydraulic fitting connection
110: Non return valve
YV: Solenoid for lowering valve

2.10 Completion of Work

Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2021-04
102: Pressure control valve
106: Lowering speed control valve
108: Lowering valve with descend screw
111 Hydraulic gear pump
Manufacturer ATH-Heinl GmbH & CO.KG
- 36 -
Tabla de contenido
loading

Este manual también es adecuado para:

Comfort lift 2.35xlComfort lift 2.40Comfort lift 2.40xl

Tabla de contenido