Installation (continued)
5
Flushing the water outlets
and checking for leaks
□
Remove the screw (G). Place the handle (F) on
the valve body (D) inverter and turn the handle
(F) to the full on mixed position. Turn on the hot
and cold water supply lines and allow the water
to ow from the outlets for one minute, or until
all foreign matter has been ushed out. Check
for leaks.
□
Shut off the water at the faucet and supply
lines. Remove the handle (F).
D
G
F
6
Installing the plaster guard
□
Place the plaster guard (L) onto the body (D)
and secure with the screws (K).
NOTE: Be sure to position the plaster guard (L) correctly
onto the body (D), with the markings "SHOWER" facing
upward.
K
L
9
Please contact 1-855-HD-GLACIER for further assistance.
D
HOMEDEPOT.COM/GLACIERBAY