Mechanical Installation; General Requirements; Securing The Module; Piping Connections - Parker domnick hunter BAM10 Manual Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

3.3 Mechanical Installation

3.3.1 General Requirements

Ensure that each filter condensate drain is suitably piped away and any effluent is disposed of in accordance with local regulations.
It is important to ensure that all piping materials are suitable for the application, clean and debris free. The diameter of the pipes must be sufficient
to allow unrestricted inlet air supply to the equipment and outlet air supply to the application.
When routing the pipes ensure that they are adequately supported to prevent damage and leaks in the system.
All components used within the system must be rated to at least the maximum operating pressure of the equipment. It is recommended that the
system be protected with suitably rated pressure relief valves.
1
M20 Mounting bolt
2
Compressed air inlet port
3
Protective dust cover

3.3.2 Securing the Module

Mounting holes are provided on each corner of the skid. Once the module has been positioned in its final location ensure that it is securely fixed
in place using M20 fixing bolts.

3.3.3 Piping Connections

Remove the protective dust covers from the inlet and outlet ports and connect the system piping. Isolation valves should be fitted to both ports to
allow the module to be isolated during maintenance.
10
4
Isolation valve
5
Outlet port
6
Electrical control box
Tabla de contenido
loading

Tabla de contenido