Tabla De Contenido; Spring - Toro Recycler 59192 Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Kit Contents
DESCRIPTION
Discharge Plug Assembly
Discharge Tunnel Assembly
Grass Bag Assembly (model 59192)
Grass Bag Assembly (model 59195)
Installation Instruction Sheet
Assembly
Install Discharge Tunnel
Note:
Determine left and right sides of
mower by standing behind handles.
1.
Remove spark plug wire from spark plug.
2.
Remove and save the (4) bolts securing the
Recycler mower cover and deflector assembly
to the deck (Fig. 1). Save the assembly for
possible future reinstallation.
1
1. Bolt (4)
2
QTY.
1
1
1
1
1
1
1
1
2
503
2. Cover and deflector
assembly
3.
Position discharge tunnel and door assembly on
deck. Align holes in discharge tunnel with holes
in deck (Fig. 2).
1
2
Figure 2
2. Vertical bolts
4.
Fasten the front right, rear right, and rear left
corners of discharge tunnel to deck, using the
bolts saved from step 2. Make sure the shorter
horizontal bolt is reinstalled in the front right
location from which it was removed in step 2.
5.
Secure spring bracket and discharge tunnel to
deck with left front bolt (Fig. 3). A socket set
extension may be necessary (Fig. 4).

1. Spring

2. Spring bracket
3
420
3. Horizontal bolt
1
2
3
1911
3. Left front bolt
Tabla de contenido
loading

Este manual también es adecuado para:

Recycler 59195

Tabla de contenido