SP6937-1_SP6937-1 1/16/15 2:38 PM Page 5
Wet/Dry Vac Assembly
1. Line up front of power head assembly
with vacuum port located on the front
of the drum, as shown.
2. Place power head assembly on top of
drum.
3. Be sure lid completely covers the top
of the drum so leakage does not
occur.
4. Push down on top of the drum latch
areas to cause the flexible locking
tabs to hook onto the drum channel.
5. Make sure that the locking tabs are
snapped in place to prevent the lid
from coming off. (See inset).
Your new Wet/Dry Vac is ready for use.
Out
Flexible
Locking Tab
Push
Down
Pull Out
Flexible
Locking
Tab
Drum
Channel
Drum
Power Head Assembly
Push
Down
Insert Hose
Insert the push button end of the pro-
hose into the inlet of the Vac. The hose
should snap into place.
To remove the hose from the Vac, press
the release button in the hose assembly
and pull the hose out of the Vac inlet,
as shown.
5
Powerhead
Assembly
Vacuum
Port
Release Button