Hilti HIT-RE 10 Manual De Instrucciones página 6

Ocultar thumbs Ver también para HIT-RE 10:
Idiomas disponibles

Idiomas disponibles

Hilti HIT-RE 10
en Adhesive anchoring system for rebar and anchor fastenings in concrete. Read the safety precautions, safety data sheet and the
product information before use.
(A)
Danger
Contains: epoxy resin (A), amines (B).
Causes severe skin burns and eye damage (A, B). May cause an allergic skin reaction (A, B). Suspected of causing genetic defects
(A). May damage fertility or the unborn child (A). Toxic to aquatic life with long lasting effects (A)./ Do not get in eyes, on skin, or on
clothing. Wear eye protection, protective clothing, protective gloves./ Review the SDS before use.
Recommended protective equipment:
Eye protection: Tightly sealed safety glasses e.g.: #02065449 Safety glasses PP EY-CA NCH clear;
#02065591 Goggles PP EY-HA R HC/AF clear;
Protective gloves: EN 374 ; Material of gloves: Nitrile rubber, NBR Avoid direct contact with the chemical/ the product/ the
preparation by organizational measures.
Final selection of appropriate protective equipment is in the responsibility of the user.
Product information
– Safety Data Sheet: Review the SDS before use.
– Check expiration date: See expiration date imprint on cartridge label (month/year). Do not use expired product.
– Cartridge temperature during usage: +10 °C to 40 °C / 50 °F to 104 °F.
– Conditions for transport and storage: Keep in a cool, dry and dark place between +5 °C to 25 °C / 41 °F to 77 °F.
– Partly used cartridges must be used up within 4 weeks. Leave the mixer or the cap attached on the cartridge and store under
the recommended storage conditions. If reused, attach a new mixer and discard the initial quantity of anchor adhesive.
– For any application not covered by this document / beyond values specified, please contact Hilti.
– If hardened epoxy is detected in cartridge neck carefully removed it to prevent blockage in the mixer.
WARNING
Improper handling may cause mortar splashes. Eye contact with mortar may cause irreversible eye damage!
– Always wear tightly sealed safety glasses, gloves and protective clothes before handling the mortar!
– Never start dispensing without a mixer properly screwed on. Before start make sure cartridge is properly
inserted into the dispenser.
– When using an extension hose: Discard of initial mortar flow must be done through supplied mixer only
(not through the extension hose).
– Never remove the mixer while the cartridge is under pressure. Press the release button of the
dispenser to avoid mortar splashing.
– Use only the type of mixer supplied with the adhesive. Do not modify the mixer or the cartridge in any way.
– Never use damaged cartridges
Poor load values / potential failure of fastening points due to inadequate borehole cleaning.
– The boreholes must be dry and free of debris, dust, water, ice, oil, grease and other contaminants prior
to adhesive injection.
– For blowing out the borehole - blow out with oil free air until return air stream is free of noticeable dust.
– Important! Remove all water from the borehole and blow out with oil free compressed air until borehole is
completely dried immediately before mortar injection.
– For brushing the borehole – only use specified wire brush. The brush must resist insertion into the borehole –
if not the brush is too small and must be replaced.
Ensure that boreholes are filled from the back of the boreholes without forming air voids.
– If necessary, use the accessories / extensions to reach the back of the borehole.
– For overhead applications use the overhead accessories HIT-SZ / IP and take special care when inserting the fastening
element. Excess adhesive may be forced out of the borehole. Make sure that no mortar drips onto the installer.
Warranty: Refer to standard Hilti terms and conditions of sale for warranty information.
Failure to observe these installation instructions, use of non-Hilti anchors, poor or questionable concrete conditions,
or unique applications may affect the reliability or performance of the fastenings.
6
(A, B)
(A)
(A, B)
loading