Zoeller ProPak 508/53 Instrucciones De Instalación página 3

Sistema pre-ensamblado de bomba de sumidero con batería de reserva
Ocultar thumbs Ver también para ProPak 508/53:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

EASY DO'S & DON'TS FOR INSTALLING A SUMP PUMP
1. DO read thoroughly all installation material provided with the system.
2. DO inspect system for any visible damage caused by shipping. Contact
dealer if system appears to be damaged.
3. DO clean all debris from the sump. Be sure that the pump will have
a hard, flat surface beneath it. DO NOT install on sand, gravel or dirt.
4. DO be sure that the sump is large enough to allow proper clearance
for the level control switch(es) to operate properly.
5. DO Always disconnect pump from power source before handling.
DO always connect to a separately protected and properly grounded
circuit.
DO NOT ever cut, splice, or damage power cord (only splice in a
watertight junction box).
DO NOT carry or lift pump by its power cord.
DO NOT use an extension cord with a sump pump.
RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
1. Electrical wiring and protection must be in accordance with
National Electrical Code and any other applicable state and
local electrical requirements.
2. All installations require a basin cover to prevent debris from
falling into the basin and to prevent accidental injury.
3. Securely tape or clamp power cord to discharge pipe, clear of
the float mechanism(s).
4. Use full-size discharge pipe.
5. Basin must be in accordance with applicable codes and
specifications.
Head ft (m)
Flow GPM (LPM)
The DC controller is equipped with a 10 amp charger for maintaining the battery in a ready state and recharging the battery after use
when AC power is restored. Time for recharge depends upon the amount of power consumed by the pumping cycle during the AC power
interruption. The system may return to the charged LED position in a very short period of time. A completely drained battery may require
up to 24 hours for full recharge.
PERFORMANCE
The DC pump performance with fully charged 12 V battery
5 (1.5)
10 (3)
39 (148)
30 (114)
© Copyright 2020 Zoeller
3
6. DO install a union in the discharge line.
DO NOT use a discharge pipe smaller than the pump discharge.
7. DO NOT use a sump pump as a trench or excavation pump, or for
pumping sewage, gasoline, or other hazardous liquids.
8. DO test system immediately after installation to be sure that the
system is working properly.
9. DO cover sump with an adequate sump cover.
10. DO review all applicable local and national codes and verify that the
installation conforms to each of them.
11. DO consult manufacturer for clarifications or questions.
12. DO inspect and test system for proper operations at least every three
months.
6. Pump must be level and float mechanism(s) clear of sides of
basin before starting pump. Float switch may be repositioned
as needed.
7. Basin must be clean and free of debris after installation.
8. Gate valve or ball valve to be supplied by installer and installed
according to any and all codes.
9. Gas tight seals required to contain gases and odors.
10. Vent gases and odors to the atmosphere through vent pipe.
11. Install Zoeller Pump Stand (Model 10-2421) under pump to
provide a settling basin.
15 (4.6)
20 (76)
Co. All rights reserved.
®
20 (6.1)
22 (6.7)
6 (23)
Shut-off Head
Tabla de contenido
loading

Este manual también es adecuado para:

Propak 508/98

Tabla de contenido