syncing two wired bases (optional)
The Y-Cord connects the two control boxes for the synchronization of two bases.
STEP 1
Unplug bases from power source.
STEP 2
Connect the male end of each Y-Cord to the multifunction port
on each control box.
STEP 3
Plug bases back into the power source.
STEP 4
Check to ensure all cords are securely attached. The
connected remote(s) will now operate both bases
simultaneously.
PERFORMANCE NOTES
If bases become mismatched, pressing the FLAT button will re-
sync the mechanical positions.
The system is now linked. Buttons pressed on either remote
will control both bases simultaneously.
A Y-Cord is included with Twin Long and CA King Split bases.
Control Box 1
Control Box 2
Wired
Remote
15