Prepare The Site - Kohler K-2238 Manual Del Usurio

Ocultar thumbs Ver también para K-2238:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Prepare the Site

NOTE: The open position of the supply stop handles must not touch
the pedestal when the pedestal is put into place. Refer to the
roughing-in illustration to determine proper placement of the supply
stop handles.
Install the 3/8" water supply lines and 1-1/4" drain piping
according to the roughing-in information.
Install wood backing behind the finished wall to provide a secure
material for the anchoring devices. The combined thickness of the
wood backing and the finished wall material must be a minimum
of 1-1/2" (3.8 cm).
Complete the finished wall.
1020735-2-C
4
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-2344

Tabla de contenido