Cooper Lighting FAIL-SAFE CFA Instrucciones De Instalación página 2

Idiomas disponibles

Idiomas disponibles

Installation Instructions – CFA
Step 1
Remove fixtures from carton.
Remove Lens (B) by gently squeezing & pulling a few inches at a time from one end to the other.
Remove (2) Hex Nuts (I) in order to remove Power Tray© from Fixture Housing (A). Keep Hex Nuts (I) for later use.
Detach Power Connectors as shown.
OPTIONAL:
Plug-in
Connectors for
Row Mounting
(0540-pi01-4-2pp)
Step 2
Follow Step 2 for stand alone fixtures or to mount first
fixture at one end of row for series mounting.Align
Fixture Housing (A) with 2" T-grid as shown and fasten
with mounting screws through pre-drilled holes.
Holes may be enlarged for use with larger mounting
screws.
Alternate mounting holes may be drilled on back of
housing. See Drill Guide Diagram in Step 3.
T-grid Ceiling
Single Fixture
2
Mounting Screws (by others)
Housing (A)
Installation Instructions – CFA
IS-083
ADC140279
Lens (B)
Power
Tray©
Hex Nut (I)
Power
Connectors
Housings (A)
Step 3
Drill Guide Diagram
Optional
A drill guide groove runs along back of the fixture for easy
customization.
Alternate mounting or access holes can be drilled within
4" from the endcap or in locations not interfering with
internal components, (ex. ballast, etc.).
Ceiling
Internal Guide
Groove
www.cooperlighting.com
OPTIONAL:
Plug-in
Connectors for
Row Mounting
(0540-pi01-4-2pp)
Clean Room
T-Grid
Housing
Channel
loading

Productos relacionados para Cooper Lighting FAIL-SAFE CFA