Before You Begin (cont.)
Confirm the contents of the box; shelving, mounting "Z" bar, and
hardware. The hardware bag should contain:
• (3) top clips
• (2) connecting blocks
• (6) polyset anchors
• (6) #10 x 2" screws
• (10) #10 x 1/2" screws
• (15) screw dome caps
• (16) shelf clips
• (50) shelf plugs
This product does not include end caps; you will need to order
separate end cap kit(s) as required for your particular installation.
Make sure electrical power can be provided before beginning the
installation. Power to the cabinets should not be controlled by the
light switch.
The installation must have a Class A Ground-Fault
Circuit-Interrupter (GFCI). The GFCI protects against
line-to-ground shock hazard. Use a 120 V, 20 A, service.
Do not complete the finished wall until all needed plumbing and
electrical rough-ins have been completed.
Kohler Co.
3