B1.10 Procedure for the proper installation 360 turning connection
PM007S
1. Insert the o-ring in the appropriate seat
2. Insert the duct in the desired position together
with the o-ring previously inserted in the 360
connection
3. Insert the 2 nuts in the appropriate seats of the
360 connection
MAN 115
MiniDUE - ENGLISH
4. Insert and tighten the screws to fix the duct
5. Insert and position the 360 connection in the
desired position on the dosing pump
6. Insert the tightening key to lock the 360
connection in the installed position
PAG.E-15