Kohler K-2971 Guía De Instalación Y Cuidado página 9

Ocultar thumbs Ver también para K-2971:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Pressure
Balancing Unit
Valve
Stop
Stop
Screw
Cover
Valve Assembly
6. Flush the Pipes
Disassemble the valve as shown to remove the internal
components.
Slowly open the water supplies to run water through the supply
pipes and valve body to remove any debris.
Inspect the two inlet seals of the pressure balancing unit (PBU). If
the seals are damaged, replace them with the provided extra inlet
seals. Lubricate the seals using the capsule provided.
To reinstall the PBU, push it into the valve in the initial
installation position with the nuts on the PBU toward the hot
inlet. Make sure the PBU seals do not come in contact with the
inlet/outlet holes during initial installation because their rough
edges may damage the seals.
Rotate the PBU counterclockwise while applying downward
pressure until it is seated in the seating indents on the bottom of
the valve. The PBU should not rotate when it is properly seated.
Reassemble the remaining valve components as shown.
Kohler Co.
Initial
Installation
Position
Valve Cap
Screw
Final Install
Position
Valve
PBU Installation
9
Water
Outlet Hole
PBU
1205550-2-C
Tabla de contenido
loading

Tabla de contenido